The Field Operations Manual

Commissioning, triage and the cost of a van

21 pagesPDF, including the commissioning checklistUpdated 26 July 2026

What you get

Takeaways

  • A twenty-three point commissioning checklist that prevents a year of tickets
  • The seven-rung triage ladder to run before booking a dispatch
  • Which faults must never be cleared remotely
  • What to stock at the depot rather than the warehouse

Contents

  1. 01

    Commissioning properly

    Electrical, network, protocol, functional and commercial checks — twenty minutes per charger that decides your support load for years.

  2. 02

    The triage ladder

    Read the state, read the fault, read the log, change availability, soft reset, hard reset, pull diagnostics. In that order, every time.

  3. 03

    Faults with special handling

    Communication loss, ground faults and missing meter values — why each breaks the standard ladder.

  4. 04

    Measuring dispatches

    Tagging outcomes, reading the distribution, and what each pattern tells you to fix.

  5. 05

    Spares and stocking

    What actually fails, in what order, and why it should sit where the technician starts their day.

  6. 06

    Firmware discipline

    Maintaining a baseline across vendors and vintages, and rolling out by cohort rather than by unit.

Or skip the reading

We are happy to work through your own numbers directly — that is usually faster than a document.